Power procurement for AI & HPC

Power for AI & HPC.

An AI or HPC campus is scheduled around its energization date and priced around its load shape. The supply contract has to fit both.

Time to power

The energization date is the critical path.

For an AI or HPC campus, power sets the schedule. Large-load interconnection studies, substation work, and transformer and switchgear lead times run years, and every month between a finished building and an energized one is capital earning nothing. Supply strategy belongs in that window. The structure, term and start date of a supply contract are decisions to make while the energization date is still an estimate, so that when it becomes real the paper is ready — and written for the load you will actually run. Need a site or a build team? Holocron Terrain screens sites, and Holocron Forge develops and operates them.

Load shape

Structure beats rate.

An AI or HPC load does not arrive all at once. It ramps on a schedule — phases energize as capacity comes online and racks are installed — and once a phase is running it runs near flat out, at a high load factor. Fixed-price paper is usually priced against a flat volume forecast. A load that grows in steps misses that forecast in both directions, under it while phases ramp and over it once they land, and bandwidth and true-up provisions charge for the misses. A lower headline rate on the wrong structure can be the more expensive contract. We structure supply around the ramp: volumes that follow the phase schedule, index or hybrid structures where they fit, and terms that let capacity be added without reopening the whole contract.

Flexibility

Flexibility is entering the AI stack.

Not every AI load is fixed. Training runs can be checkpointed and paused, and some inference can be shed or shifted to another site. Where a load can respond to price, the curtailment economics Bitcoin mining proved in ERCOT become available to it: index exposure with clean curtailment rights, a 4CP posture, and terms that reward flexibility instead of penalizing it. Where it can't — latency-bound inference, contracted uptime — structure still decides the cost, and the work is getting volume, term and price structure right for a load that runs flat out.

What you get

Bids on identical terms, scored against your dispatch.

We represent the load. Every procurement is bid by multiple supply desks on identical terms and presented side by side, and each bid is scored on levelized effective $/MWh against your site's modeled dispatch — how the site will actually run — not the headline rate. You sign the supply contract directly with the supplier you choose. After signature we stay on as broker of record and manage the contract calendar, so renewals don't land on you by surprise.