This page is a conceptual overview of how flexible loads in the ERCOT region can participate in reliability services. It is for general information. It is not a quote, an offer, or a commitment to transact, and it is not a substitute for a signed client agreement. Whether a specific facility can participate, and on what terms, is governed by current PUCT rules, ERCOT protocols and operating guides, and the qualification process run by ERCOT and the facility's qualified scheduling entity (QSE). Those rules change. Read the sources dated below, and confirm the current text before relying on any detail.
There are two different families of service, and they are easy to mix up.
- Emergency Response Service (ERS) is a special emergency service that ERCOT procures under PUCT Substantive Rule 16 TAC §25.507. It is deployed to help prevent or alleviate an actual or anticipated Energy Emergency Alert (EEA). It is not procured in the same way as the day-to-day ancillary services in the real-time market.
- Ancillary services such as ERCOT Contingency Reserve Service (ECRS) and Non-Spinning Reserve (Non-Spin) are market services ERCOT procures to balance the grid and replace reserves. A load that is registered as a Load Resource, including a Controllable Load Resource (CLR), may qualify to offer some of these services after testing.
A facility does not become eligible by having a flexible process alone. Registration with ERCOT, a Qualified Scheduling Entity, a qualification test, and real-time telemetry installed and tested between the QSE and ERCOT are part of the path for Load Resources (ERCOT Nodal Protocols §8.1.1.1(4)). The QSE must provide ERCOT with the resource's net real power consumption and operating limits in real time (§6.5.5.2(6)); for Controllable Load Resources in the real-time energy market, ERCOT issues SCED Base Points to the QSE over an Inter-Control Center Communications Protocol (ICCP) data link (§6.5.7.4). ERS has its own procurement, contract terms, and performance rules.
Controllable Load Resource, in brief
ERCOT's protocols, as summarized on ERCOT's Load Resource participation page, define:
- a Load Resource (LR) as a load capable of providing an ancillary service and/or energy in the form of demand response, and registered with ERCOT as a Load Resource;
- a Controllable Load Resource (CLR) as a Load Resource capable of controllably reducing or increasing consumption under dispatch control by ERCOT;
- an Aggregate Load Resource (ALR) as a CLR made up of individual metered sites, each with less than 10 MW of demand-response capability, all in a single load zone.
ERCOT's December 2025 ancillary-services handout describes a CLR as a load that can offer into the real-time market and reduce or increase consumption based on the five-minute market dispatch. The Protocols do not set a minimum size for a Controllable Load Resource. An Aggregate Load Resource, which is itself a CLR, may combine individual metered sites each with less than 10 MW of demand-response capability in a single load zone (ERCOT Nodal Protocols, Section 2).
Qualified Controllable Load Resources may participate in the real-time energy market through security-constrained economic dispatch (SCED) (ERCOT Nodal Protocols §6.5.7.4) and, if they pass the relevant qualification test, may be able to provide ancillary services that include ECRS, Non-Spin, Regulation Up, Regulation Down, and Responsive Reserve (RRS). A Load Resource can also be non-controllable: a block of load that trips automatically on a high-set under-frequency relay, rather than following five-minute dispatch. Those resources may provide Responsive Reserve, and they may also provide ECRS, which does not require under-frequency relay control (§3.17.2(3)(c), §3.17.4(4)(c), §3.18(4)(d)). The QSE representing the Load Resource handles market operations and settlement. This page does not walk through the registration sequence in full; ERCOT publishes that process and updates it.
Emergency Response Service (ERS)
ERS is authorized by 16 TAC §25.507. ERCOT's program page states that ERCOT procures ERS by selecting qualified loads and generators, including aggregations, to make themselves available for deployment in a grid emergency. Participants are required to provide an agreed amount of megawatts within ten or thirty minutes to help prevent or alleviate an actual or anticipated EEA.
Under the current program description, ERCOT procures ERS four times in an ERS calendar year that begins in December and ends in November. The standard contract terms are December–March, April–May, June–September, and October–November. For each term, ERCOT procures two response times: thirty minutes (ERS-30) and ten minutes (ERS-10).
The rule itself, in the 4 August 2022 official text, includes these points, among others:
- An ERS resource must be represented by a QSE, and offers must be submitted through that QSE. Loads may be aggregated to reach ERCOT's minimum offer size; an aggregation is treated as a single ERS resource for offering.
- A resource must not commit to provide ERS if it is separately obligated to provide a response with the same capacity during any of the same hours.
- When dispatched, an ERS resource must deploy consistent with its obligations and remain deployed until recalled by ERCOT.
- Deployment of an ERS resource is limited to the hours for which the service was contracted, up to a maximum of 24 cumulative hours in an ERS contract period, with a limited exception if an instruction would otherwise exceed that total.
- ERCOT must establish qualifications, performance criteria, and testing procedures. Noncompliance can lead to reduced payment, suspension, or administrative penalties for the QSE.
The rule also sets an ERCOT expenditure cap for ERS in a 12-month period, with a limited additional amount for contract renewals when ERS has been exhausted, unless the Commission determines otherwise. Those dollar caps are in the rule text cited below. They are not a payment a participant should expect, and this page does not estimate what any facility would be paid.
ERS is a contracted emergency service. It is not a substitute for market ancillary services, and the same capacity cannot be committed twice for the same hours.
ERCOT Contingency Reserve Service (ECRS)
ECRS is a market ancillary service. ERCOT's December 2025 ancillary-services handout describes it as capacity that can respond within 10 minutes to address forecasting errors or to replace deployed reserves.
Qualified load resources, including CLRs, may be able to provide ECRS after they are registered and pass the qualification test for that service. ERCOT's Load Resource page lists ECRS among the ancillary services a qualified load resource may provide. The operating details — how fast the load must move, how long it must hold a set point, and how performance is measured — are in the current ERCOT protocols and operating guides, which are revised from time to time. This page does not restate those performance numbers, because they should be read from the current protocol text and confirmed with the facility's QSE.
ECRS is procured as part of ERCOT's ancillary-services markets. Since the Real-Time Co-optimization Plus Batteries (RTC+B) market design was implemented in December 2025, ERCOT has described ancillary-service procurement as occurring in a way that is co-optimized with energy, with some quantities adjusted closer to the operating day and in real time. That market-design context matters for how offers work; it does not, by itself, make any load eligible.
Non-Spinning Reserve (Non-Spin)
Non-Spin is a market ancillary service. ERCOT's December 2025 handout describes it as capacity that can be available within 30 minutes to cover forecast errors or to replace deployed reserves.
Qualified load resources, including CLRs, may be able to provide Non-Spin after registration and qualification. As with ECRS, the protocol-level performance requirements should be read from the current ERCOT protocols and confirmed with the QSE. This page does not claim that every flexible load can provide Non-Spin, or that a mining or data-center load is automatically qualified.
What participation is not
- It is not automatic. Flexible operation is not the same thing as a registered Load Resource or an ERS resource.
- It is not a revenue forecast. Clearing prices, offer outcomes, performance adjustments, and contract terms vary. This page does not project payments.
- It is not a way around interconnection or retail-supply rules. Registration and qualification sit alongside, not in place of, the customer's interconnection and supply arrangements.
- It is not legal, engineering, or market-participation advice. A QSE, and where needed independent counsel or an engineer, should review a specific facility.
Provisions this page does not interpret
PURA §37.0561(e), enacted in Senate Bill 6 (89th Legislature), addresses disclosure of on-site backup generating facilities for certain large-load customers and authorizes the independent organization, after deploying all available market services, except for frequency responsive services, to direct an applicable electric utility or municipally owned utility to require those customers to deploy on-site backup generating facilities or curtail load, under conditions set out in the statute. The same subsection states that it does not prohibit a large load customer from participating in a service authorized by PURA §39.170(b).
PURA §39.170, also added by Senate Bill 6 and titled Large Load Demand Management Service, directs the Commission to require the independent organization certified under Section 39.151 to ensure that each electric cooperative, transmission and distribution utility, and municipally owned utility serving a transmission-voltage customer develops a protocol, including the installation of any necessary equipment or technology before the customer is interconnected, to allow the load to be curtailed during firm load shed. That requirement applies only to a load interconnected after December 31, 2025, other than exceptions set out in the statute. The same section directs the Commission to require that independent organization to develop a reliability service to competitively procure demand reductions from large load customers with a demand of at least 75 megawatts to be deployed in the event of an anticipated emergency condition, under conditions set out in the statute.
This page does not interpret or apply PURA §37.0561(e) or §39.170, and it does not state how those provisions will work in practice for any class of load. Implementing Commission rules were still being developed as of 15 November 2026. We will update this page after those rules are adopted, rather than describe obligations that are not yet in final implementing text.
What this page is not
This page is for general information. It is not a quote, an offer, or a commitment to transact, and it is not a substitute for a signed client agreement. It does not determine eligibility for any ERCOT service.
Sources
Retrieved 15 November 2026.
- ERCOT, Emergency Response Service program page, https://www.ercot.com/services/programs/load/eils
- Public Utility Commission of Texas, 16 TAC §25.507, Electric Reliability Council of Texas (ERCOT) Emergency Response Service (ERS), official text effective 4 August 2022 (Project 53493), https://ftp.puc.texas.gov/public/puct-info/agency/rulesnlaws/subrules/electric/25.507/25.507.pdf
- ERCOT, Load Resource Participation in the ERCOT Markets, https://www.ercot.com/services/programs/load/laar
- ERCOT, Ancillary Services handout, December 2025, https://www.ercot.com/files/docs/2025/12/29/Ancillary-Services-Handout.pdf
- ERCOT, Current Protocols — Nodal, effective November 6, 2026, Section 2 (Load Resource, Controllable Load Resource, and Aggregate Load Resource definitions), Section 3.14.3 (Emergency Response Service), Section 3.17.2 (Responsive Reserve), Sections 3.17.3 and 3.17.4 (Non-Spinning Reserve and ERCOT Contingency Reserve Service), Section 3.18 (Resource Limits in Providing Ancillary Service), Section 6.5.5.2 (Operational Data Requirements), Section 6.5.7.4 (Base Points), and Section 8.1.1.1 (Ancillary Service Qualification and Testing), https://www.ercot.com/mktrules/nprotocols/current/ (PDF convenience copy: https://www.ercot.com/files/docs/2026/11/05/November-6-2026-Nodal-Protocols.pdf)
- Texas Utilities Code §37.0561 (PURA), Planning for and Interconnection of Large Loads, https://statutes.capitol.texas.gov/Docs/UT/htm/UT.37.htm
- Texas Utilities Code Chapter 39 (PURA), https://statutes.capitol.texas.gov/Docs/UT/htm/UT.39.htm
- Senate Bill 6, enrolled text (89th Legislature), adding PURA §37.0561 and §39.170, https://capitol.texas.gov/tlodocs/89R/billtext/html/SB00006F.htm